Open Tasks9Tasks still requiring action
Overdue Tasks1Open tasks past their due date
Critical Tasks7Open work with critical priority
Machines19Equipment currently tracked
Recent Maintenance Requests
CriticalMay 27, 2026, 7:04 PM
Steer 50 was shut down due to a vacuum pump overheating error.
Production on Steer 50 has halted, directly impacting output. Since production is stopped, this must be classified as critical even though there is no immediate safety or quality risk.
- Issue Type
- Vacuum pump overheating and equipment shutdown
- Production
- Steer 50 is stopped—production halted on this line.
CriticalMay 23, 2026, 5:14 AM
not rotating
Production is stopped, which leads to lost output and potential missed deadlines. Even though no safety or quality issues are reported, restoring production is a top priority per rule-based guidelines.
- Issue Type
- Equipment not rotating
- Production
- Production is stopped due to equipment not rotating.
HighMay 20, 2026, 2:54 AM
The pelletizer and classifier need to be cleaned, and the cutters require sharpening.
While production is not halted and there is no immediate safety concern, a noted decline in product quality elevates the urgency. Preventive maintenance should be prioritized to maintain standards and avoid further impact.
- Issue Type
- Scheduled cleaning and sharpening maintenance
- Production
- Production is not stopped, but ongoing quality could be impacted if cleaning and sharpening are not performed.
LowMay 19, 2026, 6:49 PM
No maintenance issue described.
There is no described maintenance issue, and all other factors indicate no impact, justifying a low priority and no required action.
- Issue Type
- No maintenance issue described
- Production
- No production impact
LowMay 19, 2026, 6:49 PM
This is a test email. No maintenance issue described.
There is no maintenance concern, no impact to production, safety, or quality. The requestor marked urgency as low. This is for testing only.
- Issue Type
- non-issue / test request
- Production
- none